I need a solution
I finally made the jump to convert from BE2010 R3 SP4 (had to for Server 2012 R2 !) and I'm tweaking the jobs schedules that were "converted".
I found the "LAST "X" OF THE Y" setting and set it to be the last FRIDAY of the MONTH .. and allow it to run over the weekend.
But when I went to set the "WEEKDAYS" DIFFERENTIAL to be excluded from the LAST DAY (FRIDAY) OF THE MONTH, there does NOT appear to be an option to do this. Am I missing something or has Symantec removed another needed feature ?